Flood risk
Contents |
[edit] Introduction
The National Planning Policy Framework considers flood risk to be the combination of the probability and the potential consequences of flooding from all sources, including:
- Rivers and the sea.
- Rainfall.
- Rising groundwater.
- Overwhelmed sewers and drainage systems.
- Reservoirs, canals and lakes.
- Other artificial sources.
[edit] Flood zone and flood risk tables
The Environment Agency has produced a Flood Map for Planning which has three zones of flooding and refers to the probability of the river and sea flooding but does not consider the presence of any defences.
The zones and definitions are as follows:
- Zone 1 Low probability: Land having a less than 1 in 1,000 annual probability of river or sea flooding.
- Zone 2 Medium probability: Land having between a 1 in 100 and 1 in 1,000 annual probability of river flooding; or land having between a 1 in 200 and 1 in 1,000 annual probability of sea flooding.
- Zone 3a High probability: Land having a 1 in 100 or greater annual probability of river flooding; or land having a 1 in 200 or greater annual probability of sea flooding.
- Zone 3b The Functional Floodplain: This zone comprises land where water has to flow or be stored in times of flood.
[edit] Planning and flood risk
The National Planning Policy Framework (NPPF) sets out policies to avoid inappropriate development in areas at risk of flooding. This includes requiring new development to be flood resilient and resistant where appropriate. The NPPF defines tests that local planning authorities are expected to abide by in order to protect people and property. If the tests cannot be met, new development should not be permitted.
The steps are:
- Assessment of flood risk: A Strategic Flood Risk Assessment is undertaken by the local planning authority and informs local flood risk. In any areas that are at a high risk of flooding or for development on sites of over 1 hectare, site-specific flood risk assessments are required to accompany planning applications.
- Avoid flood risk: Local planning authorities will aim to avoid site-selection in areas of high flood risk. Development is targeted where the risk of flooding is lowest.
- Manage and mitigate flood risk: If development is needed on land at risk of flooding and no alternative options exist, it is necessary for the development to be flood resilient and resistant for the development’s lifetime.
[edit] Building Regulations
Approved document C, Site preparation and resistance to contaminants and moisture, suggests that when building in flood prone areas, buildings can be constructed to mitigate some of the effects of flooding:
- Elevated groundwater levels or flow of subsoil water across the site can be alleviated by the provision of adequate sub-soil drainage.
- Sewer flooding due to backflow or surcharging of sewers or drains can be addressed through the use of non-return valves and anti-flooding devices.
- Intrusion of groundwater through floors can be addressed through the use of water resistant construction.
- Where there is a risk of the entry of water into floor voids, provision to inspect and clear out sub-floor voids can be considered.
It references: Improving the flood performance of new buildings – Flood resilient construction, Communities and Local Government, Defra and the Environment Agency, May 2007, as a source of further information.
[edit] Flood and Water Management Act 2010
The Flood and Water Management Act was introduced on 8 April 2010 to implement Sir Michael Pitt’s recommendations following the widespread flooding of 2007 when more than 55,000 homes and businesses were flooded (see Pitt Review).
The Act requires better management of flood risk, it creates safeguards against rises in surface water drainage charges and protects water supplies for consumers. It gives a new responsibility to the Environment Agency for developing a National Flood and Coastal Risk Management Strategy, and gives a new responsibility to local authorities, as Lead Local Flood Authorities (LLFAs), to co-ordinate flood risk management in their area.
For more information see: Flood and Water Management Act .
[edit] Related articles on Designing Buildings
- Applying flood resilience technologies GG 84.
- BS 851188.
- Building flood resilience.
- Catchment flood management plans.
- Coastal defences.
- Flood.
- Flood and Water Management Act.
- Flood defences.
- Flood insurance.
- Flood risk assessment.
- Flood Risk Framework.
- Flood risk management plans.
- Floodscape.
- Future flood prevention.
- Integrated water management.
- Lead local flood authorities LLFAs.
- Pitt Review.
- Planning for floods (this article needs more work).
- River engineering.
- Sustainable urban drainage systems.
- Thames barrier.
- Water engineering.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.